MDT 139

  • Has reduced dimensions in space due to the slewing part without cathead or jib tie bars
  • Smaller overall height erection operations at a reduced height
  • Easier overflying of obstacles on site (cranes electricity lines cables ..)
  • Jib configuration can be changed in the air during evolution of sites